Solving an integrated scheduling and routing problem with inventory, routing and penalty costs
From MaRDI portal
Publication:2239995
Recommendations
- Integrated machine scheduling and vehicle routing with time windows
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs
- Integrated production scheduling and delivery routing: complexity results and column generation
- Integrated production, inventory and delivery problems: complexity and algorithms
- Integrated Job Scheduling with Parallel-Batch Processing and Batch Deliveries
Cites work
- A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints
- Algorithms for the Assignment and Transportation Problems
- Comparing sequential and integrated approaches for the production routing problem
- Designing efficient order picking systems by combining planning problems: state-of-the-art classification and review
- Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs
- Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete
- scientific article; zbMATH DE number 3231692 (Why is no real title available?)
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG
- Integrated production and distribution scheduling with lifespan constraints
- Integrated production and multiple trips vehicle routing with time windows and uncertain travel times
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Nearest neighbor pattern classification
- On the Computational Complexity of Combinatorial Problems
- The Complexity of Flowshop and Jobshop Scheduling
- The nuclear medicine production and delivery problem
Cited in
(10)- Integrated inventory routing problem with quality time windows and loading cost for deteriorating items under discrete time
- Integrated production and transportation scheduling with order-dependent inventory holding costs
- A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows
- Flexible job-shop scheduling with transportation resources
- Minimizing earliness-tardiness costs in supplier networks -- a just-in-time truck routing problem
- A review on integrated scheduling and outbound vehicle routing problems
- Limited integrated production scheduling and vehicle routing in the steel industry
- Transportation and delivery in flow-shop scheduling problems: a systematic review
- Integrated production and transportation rescheduling with type-dependent setup times and multiple shipping modes
- A branch-price-and-cut algorithm for sustainable milk-run vehicle scheduling problem with cross-dimensional integration
This page was built for publication: Solving an integrated scheduling and routing problem with inventory, routing and penalty costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2239995)