A periodic review policy for a coordinated single vendor-multiple buyers supply chain with controllable lead time and distribution-free approach
From MaRDI portal
Publication:2240673
Recommendations
- An integrated inventory model with controllable lead time and distribution-free demand
- Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints
- Optimal review period and backorder rate in a periodic review inventory model with controllable lead time
- A note on periodic review inventory model with controllable setup cost and lead time.
- Two-echelon supply chain inventory model with controllable lead time
Cites work
- A note on periodic review inventory model with controllable setup cost and lead time.
- A review of the joint replenishment problem literature: 1989--2005
- An integrated inventory model with controllable lead time and distribution-free demand
- Computational complexity of uncapacitated multi-echelon production planning problems
- Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model
- Distribution Free Procedures for Some Inventory Models
- Effective and simple EOQ-like solutions for stochastic demand periodic review systems
- Joint economic lot size (JELS) model for single-vendor single-buyer with variable production rate and partial backorder
- Reducing lost-sales rate in \((T, R, L)\) inventory model with controllable lead time
- Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions
- Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints
- Single-vendor multi-buyer inventory coordination under private information
Cited in
(3)- An integrated inventory model with controllable lead time and distribution-free demand
- Distribution-free approach for stochastic joint-replenishment problem with backorders-lost sales mixtures, and controllable major ordering cost and lead times
- Developing a coordinated vendor-buyer model in two-stage supply chains with stochastic lead-times
This page was built for publication: A periodic review policy for a coordinated single vendor-multiple buyers supply chain with controllable lead time and distribution-free approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2240673)