Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
From MaRDI portal
Publication:2241320
DOI10.1007/s43069-021-00096-7zbMath1476.90122MaRDI QIDQ2241320
Abbasali Jafari-Nodoushan, Reza Tavakkoli-Moghaddam, M. M. Lotfi, Hassan Khademi-Zare
Publication date: 8 November 2021
Published in: SN Operations Research Forum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s43069-021-00096-7
90C11: Mixed integer programming
90C57: Polyhedral combinatorics, branch-and-bound, branch-and-cut
90C30: Nonlinear programming
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming