A new continuous model for multiple re-entrant manufacturing systems
From MaRDI portal
Publication:2253381
DOI10.1016/J.EJOR.2012.07.002zbMath1292.90106OpenAlexW1964458775MaRDI QIDQ2253381
Publication date: 27 July 2014
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.07.002
Production models (90B30) First-order nonlinear hyperbolic equations (35L60) Initial-boundary value problems for first-order hyperbolic systems (35L50) PDEs in connection with mathematical programming (35Q90)
Cites Work
- Unnamed Item
- Modeling and analysis of reentrant manufacturing systems: micro- and macroperspectives
- A fluid dynamic model for supply chains
- Continuum modeling of supply chain networks using discontinuous Galerkin methods
- Network models for supply chains
- A Continuum Model for a Re-entrant Factory
- A Proof for the Queuing Formula: L = λW
- A new continuous model for job-shop scheduling
- Scheduling, Location, Transportation, and Continuum Mechanics: Some Simple Approximations to Optimization Problems
- Stability and Instability of Fluid Models for Reentrant Lines
- Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Closed Network
- A sufficient condition for instability of buffer priority policies in re-entrant lines
- Thermalized Kinetic and Fluid Models for Reentrant Supply Chains
- On kinematic waves II. A theory of traffic flow on long crowded roads
This page was built for publication: A new continuous model for multiple re-entrant manufacturing systems