Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
From MaRDI portal
Publication:2253540
DOI10.1016/j.ejor.2012.10.048zbMath1292.90111OpenAlexW2038231373MaRDI QIDQ2253540
Dae-Young Chung, Byung-Cheon Choi
Publication date: 27 July 2014
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.10.048
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (8)
The design of simple subcontracting rules for make-to-order shops: an assessment by simulation ⋮ Outsourcing and scheduling for a two-machine flow shop with release times ⋮ Scheduling with divisible jobs and subcontracting option ⋮ Scheduling of two-machine flowshop with outsourcing lead-time ⋮ Min-max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty ⋮ Coordinated scheduling of the outsourcing, in-house production and distribution operations ⋮ Makespan minimization for the \(m\)-machine ordered flow shop scheduling problem ⋮ An improved algorithm for a two-stage production scheduling problem with an outsourcing option
This page was built for publication: Outsourcing and scheduling for two-machine ordered flow shop scheduling problems