Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan
From MaRDI portal
Publication:2268765
DOI10.1007/S10878-008-9163-ZzbMATH Open1183.90179OpenAlexW2014763284MaRDI QIDQ2268765FDOQ2268765
Authors: Jinjiang Yuan, Shisheng Li
Publication date: 9 March 2010
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-008-9163-z
Recommendations
- The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan
- Scheduling jobs with release dates on parallel batch processing machines to minimize the makespan
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
- Parallel machine scheduling by family batching with sequence-independent set-up times
- Scheduling jobs with release dates on parallel batch processing machines
- Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
- Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families
- Scheduling job families on non-identical parallel machines with time constraints
- Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
- Exact algorithms for scheduling multiple families of jobs on parallel machines
Cites Work
- Scheduling a batching machine
- Scheduling one batch processor subject to job release dates
- On scheduling an unbounded batch machine
- Minimizing makespan on a single batch processing machine with dynamic job arrivals
- Bounds on Multiprocessing Timing Anomalies
- Approximation algorithms in batch processing
- Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
- Title not available (Why is that?)
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
- Complexity results for single-machine problems with positive finish-start time-lags
- Minimizing makespan with release times on identical parallel batching machines
Cited In (13)
- Min–Max Scheduling of Batch or Drop-Line Jobs Under Agreeable Release and Processing Times
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
- The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan
- Scheduling jobs with release dates on parallel batch processing machines
- Pareto optimization scheduling of family jobs on a p-batch machine to minimize makespan and maximum lateness
- Parallel batch scheduling of equal-length jobs with release and due dates
- Unbounded parallel-batching scheduling with two competitive agents
- Unbounded parallel-batch scheduling with family jobs and delivery coordination
- Scheduling a bounded parallel-batching machine with incompatible job families and rejection
- Online scheduling on unbounded parallel-batch machines with incompatible job families
- Minimizing makespan with release times on identical parallel batching machines
- Exact algorithms for scheduling multiple families of jobs on parallel machines
- Single-machine batch scheduling with job processing time compatibility
This page was built for publication: Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2268765)