A comparison of formulations for a three-level lot sizing and replenishment problem with a distribution structure
From MaRDI portal
Publication:2273683
Recommendations
- Valid inequalities, preprocessing, and an effective heuristic for the uncapacitated three-level lot-sizing and replenishment problem with a distribution structure
- On reformulations for the one-warehouse multi-retailer problem
- The one-warehouse multi-retailer problem: reformulation, classification, and computational results
- A polyhedral study of multiechelon lot sizing with intermediate demands
- Uncapacitated two-level lot-sizing
Cites work
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A constant approximation algorithm for the one-warehouse multiretailer problem
- A hierarchical planning approach for a production-distribution system
- A variable neighborhood decomposition search method for supply chain management planning problems
- Computational complexity of uncapacitated multi-echelon production planning problems
- Dynamic version of the economic lot size model
- Hierarchical design of an integrated production and 2-echelon distribution system
- scientific article; zbMATH DE number 3568353 (Why is no real title available?)
- scientific article; zbMATH DE number 1342809 (Why is no real title available?)
- Modeling industrial lot sizing problems: a review
- On reformulations for the one-warehouse multi-retailer problem
- Production Planning by Mixed Integer Programming
- Single-item dynamic lot-sizing problems: an updated survey
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- The one-warehouse multi-retailer problem: reformulation, classification, and computational results
- The production routing problem: a review of formulations and solution algorithms
- Uncapacitated lot-sizing: The convex hull of solutions
- Uncapacitated two-level lot-sizing
Cited in
(10)- Benders decomposition for a stochastic three-level lot sizing and replenishment problem with a distribution structure
- Formulations and theoretical analysis of the one-dimensional multi-period cutting stock problem with setup cost
- Valid inequalities, preprocessing, and an effective heuristic for the uncapacitated three-level lot-sizing and replenishment problem with a distribution structure
- Integrated lot sizing and blending problems
- Data-driven branching and selection for lot-sizing and scheduling problems with sequence-dependent setups and setup carryover
- On reformulations for the one-warehouse multi-retailer problem
- Split demand and deliveries in an integrated three-level lot sizing and replenishment problem
- A heuristic algorithm to solve the one‐warehouse multiretailer problem with an emission constraint
- A heuristic approach for the integrated production-transportation problem with process flexibility
- Stochastic production-distribution planning with transportation mode-dependent lead times
This page was built for publication: A comparison of formulations for a three-level lot sizing and replenishment problem with a distribution structure
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2273683)