Feedback control for priority rules in re-entrant semiconductor manufacturing
From MaRDI portal
Publication:2282342
DOI10.1016/J.APM.2015.03.061zbMath1443.90033OpenAlexW800454032MaRDI QIDQ2282342
Fenglan He, Ming Dong, Dieter Armbruster, Michael Herty
Publication date: 7 January 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2015.03.061
Mathematical modeling or simulation for problems pertaining to systems and control theory (93-10) Mathematical modeling or simulation for problems pertaining to operations research and mathematical programming (90-10)
Cites Work
- Autonomous control methods in logistics -- a mathematical perspective
- Modelling and optimization of supply chains on complex networks
- A Continuum Model for a Re-entrant Factory
- Controlling a re-entrant manufacturing line via the push–pull point
- Modeling, Simulation, and Optimization of Supply Chains
- Unnamed Item
This page was built for publication: Feedback control for priority rules in re-entrant semiconductor manufacturing