Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing
From MaRDI portal
Publication:2283857
DOI10.3390/A11050068zbMath1461.90059OpenAlexW2802025519WikidataQ129850906 ScholiaQ129850906MaRDI QIDQ2283857
Francisco Villalobos-Rodríguez, Ricardo Salomon-Torres, Andrei Tchernykh, Victor Hugo Yaurima-Basaldua
Publication date: 13 January 2020
Published in: Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3390/a11050068
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises
- A taxonomy of flexible flow line scheduling procedures
- Optimal designed experiments using a Pareto front search for focused preference of multiple objectives
- A simple and effective evolutionary algorithm for the vehicle routing problem
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Operational methods for minimization of energy consumption of manufacturing equipment
This page was built for publication: Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing