Heuristic algorithms to maximize revenue and the number of jobs processed on parallel machines
From MaRDI portal
Publication:2290308
Recommendations
- Revenue maximization on parallel machines
- Heuristic algorithms for a complex parallel machine scheduling problem
- Some Heuristics for Scheduling Jobs on Parallel Machines with Setups
- A heuristic for maximizing the number of on-time jobs on two uniform parallel machines
- Heuristic algorithms for scheduling jobs on identical parallel machines via measures of spread
- An algorithm for the maximum revenue jobshop problem
- Heuristic and exact algorithms for the identical parallel machine scheduling problem
- Scheduling jobs on a single machine to maximize the total revenue of jobs
- Optimal and heuristic solution methods for a multiprocessor machine scheduling problem
- Heuristics for scheduling unrelated parallel machines
Cites work
- A tabu search algorithm for parallel machine total tardiness problem
- Complexity of shop-scheduling problems with fixed number of jobs: a survey
- Efficient algorithms for machine scheduling problems with earliness and tardiness penalties
- Future paths for integer programming and links to artificial intelligence
- GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times
- Heuristic methods for the identical parallel machine flowtime problem with set-up times
- Minimizing total weighted flow time under uncertainty using dominance and a stability box
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms
- Operations research. A practical introduction
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Parallel machine scheduling with earliness and tardiness penalties
- Revenue maximization on parallel machines
- Robust scheduling of parallel machines with sequence-dependent set-up costs
- Scheduling unrelated parallel machines with sequence-dependent setups
Cited in
(2)
This page was built for publication: Heuristic algorithms to maximize revenue and the number of jobs processed on parallel machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2290308)