Dynamic non-probabilistic reliability evaluation and service life prediction for arch dams considering time-varying effects
From MaRDI portal
Publication:2293316
Recommendations
- Evaluation model for service life of dam based on time-varying risk probability
- Performance assessment of a concrete gravity dam at Shenwo reservoir of China using deterministic and probabilistic methods
- The application of convex models based on non-probabilistic concepts of reliability in bridge assessments
- scientific article; zbMATH DE number 1357951
- The dynamic characteristics of the damage probability of a gravity dam
Cites work
- A response-surface-based structural reliability analysis method by using non-probability convex model
- Convex Models of Uncertainty in Radial Pulse Buckling of Shells
- Correlation analysis of non-probabilistic convex model and corresponding structural reliability technique
- Efficient sampling methods for global reliability sensitivity analysis
- Evaluation model for service life of dam based on time-varying risk probability
- Fatigue reliability based on residual strength model with hybrid uncertain parameters
- Non-probabilistic convex models and interval analysis method for dynamic response of a beam with bounded uncertainty
- Nonlinear finite element reliability analysis of concrete-faced rockfill (CFR) dams under static effects
- Recent advances in non-probabilistic approaches for non-deterministic dynamic finite element analysis
Cited in
(12)- Evaluation model for service life of dam based on time-varying risk probability
- Optimized prediction model for concrete dam displacement based on signal residual amendment
- Stochastic chemo-physical-mechanical degradation analysis on hydrated cement under acidic environments
- Prediction of arch dam deformation via correlated multi-target stacking
- On the use of probabilistic and non-probabilistic super parametric hybrid models for time-variant reliability analysis
- An effective approach for probabilistic lifetime modelling based on the principle of maximum entropy with fractional moments
- Integrated certainty and uncertainty evaluation approach for seepage control effectiveness of a gravity dam
- Dynamic inversion method for the material parameters of a high arch dam and its foundation
- Performance assessment of a concrete gravity dam at Shenwo reservoir of China using deterministic and probabilistic methods
- Monumental dams
- Data-based models for the prediction of dam behaviour: a review and some methodological considerations
- Response surface method based on uniform design and weighted least squares for non-probabilistic reliability analysis
This page was built for publication: Dynamic non-probabilistic reliability evaluation and service life prediction for arch dams considering time-varying effects
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2293316)