Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading
DOI10.1016/J.APM.2017.04.039zbMATH Open1480.90147OpenAlexW2613606197MaRDI QIDQ2293995FDOQ2293995
Lixin Tang, Xie Xie, Yan-Ping Li, Yongyue Zheng
Publication date: 5 February 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2017.04.039
Recommendations
- Scheduling of a single crane in batch annealing process
- A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- Sequencing dual-spreader crane operations: mathematical formulation and heuristic algorithm
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11)
Cites Work
- A crane scheduling method for port container terminals
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Container terminal operation and operations research -- a classification and literature review
- Operations research at container terminals: a literature update
- Current trends in deterministic scheduling
- Modeling and solving rich quay crane scheduling problems
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
- The quay crane scheduling problem with time windows
- Crane scheduling with non-crossing constraint
- Crane scheduling with spatial constraints
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- Scheduling in robotic cells: Complexity and steady state analysis
- Cyclic scheduling in robotic flowshops
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
- Scheduling of a single crane in batch annealing process
This page was built for publication: Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2293995)