Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty
DOI10.1016/J.APM.2017.06.002zbMATH Open1480.90143OpenAlexW2630657624MaRDI QIDQ2294752FDOQ2294752
Authors: Çağrı Sel, Bilge Bilgen, Jacqueline M. Bloemhof-Ruwaard
Publication date: 12 February 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2017.06.002
Recommendations
- Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling
- Optimal production scheduling for the dairy industry
- On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay
- Solving a rich position-based model for dairy products
- An MILP-based approach to the short-term scheduling of make-and-pack continuous production plants
Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cites Work
- The hybrid flow shop scheduling problem
- Influence of capacity- and time-constrained intermediate storage in two-stage food production systems
- Flowshop-scheduling problems with makespan criterion: a review
- Integrated production and distribution planning in the fast moving consumer goods industry: A block planning application
- Influence of consumer purchasing behaviour on the production planning of perishable food
- Multi-stage simultaneous lot-sizing and scheduling for flow line production
- A hybrid method for large-scale short-term scheduling of make-and-pack production processes
- Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
- Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO©
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- An MILP-based approach to the short-term scheduling of make-and-pack continuous production plants
- Multi-objective stochastic linear programming problem when \(b_i\)'s follow Weibull distribution
- Optimal production scheduling for the dairy industry
- Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling
- A lot-sizing and scheduling model for multi-stage flow lines with zero lead times
- Title not available (Why is that?)
Cited In (3)
Uses Software
This page was built for publication: Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2294752)