Stochastic project scheduling with hierarchical alternatives
From MaRDI portal
Publication:2295321
DOI10.1016/j.apm.2017.09.015zbMath1480.90150OpenAlexW2759495093MaRDI QIDQ2295321
Sha Tao, Xiangyu Wang, Changzhi Wu, Zhao-Han Sheng
Publication date: 12 February 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2017.09.015
project schedulingsample average approximation (SAA)discrete artificial algae algorithm (DAAA)hierarchical alternative methodstochastic activity durationstochastic chance constraint
Related Items (7)
Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ A clustering‐based review on project portfolio optimization methods ⋮ A multi-objective hot-rolling scheduling problem in the compact strip production ⋮ An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ A study on the optimal inventory allocation for clinical trial supply chains ⋮ Improved cuckoo search algorithm for numerical function optimization ⋮ A hybrid chaos firefly algorithm for three-dimensional irregular packing problem
Uses Software
Cites Work
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
- A genetic algorithm for the robust resource leveling problem
- Project selection and scheduling with uncertain net income and investment cost
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Scheduling resource-constrained projects with a flexible project structure
- An approach using SAT solvers for the RCPSP with logical constraints
- Scheduling modular projects on a bottleneck resource
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Production scheduling with alternative process plans
- On the complexity of scheduling unit-time jobs with or-precedence constraints
- Fuzzy project scheduling problem and its hybrid intelligent algorithm
- On the latest starting times and criticality of activities in a network with imprecise durations
- Minimizing total weighted late work in the resource-constrained project scheduling problem
- Integrated scheduling and batch ordering for construction project
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- A binary differential search algorithm for the 0-1 multidimensional knapsack problem
- Maximizing lifetime of a wireless sensor network via joint optimizing sink placement and sensor-to-sink routing
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Project scheduling problem with stochastic activity duration times
- Chance-Constrained Programming
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
- A Sample Approximation Approach for Optimization with Probabilistic Constraints
This page was built for publication: Stochastic project scheduling with hierarchical alternatives