A metaheuristic algorithm to transporter scheduling for assembly blocks in a shipyard considering precedence and cooperating constraints
From MaRDI portal
(Redirected from Publication:2296473)
Recommendations
- Ship block transportation scheduling approach based on genetic algorithm
- Flat-car scheduling optimization method based on genetic algorithm
- Spatial scheduling optimization algorithm for block assembly in shipbuilding
- Research on dispatch of blocks between stockyards based on hybrid optimization algorithm
- Obstructive block stockyard scheduling and optimization based on heuristic rules
Cites work
- scientific article; zbMATH DE number 1324130 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- A tabu search heuristic for the inland container transportation problem
- A tabu search method for the truck and trailer routing problem
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
- Routing problems: A bibliography
- Synchronized arc routing for snow plowing operations
- The Synchronized Dynamic Vehicle Dispatching Problem
- The synchronized arc and node routing problem: application to road marking
- The vehicle routing problem with time windows and temporal dependencies
- Truck and trailer routing -- problems, heuristics and computational experience
Cited in
(6)- Spatial scheduling and workforce assignment problem in block assembly shop of shipbuilding
- Flat-car scheduling optimization method based on genetic algorithm
- Spatial scheduling optimization algorithm for block assembly in shipbuilding
- Research on dispatch of blocks between stockyards based on hybrid optimization algorithm
- Ship block transportation scheduling approach based on genetic algorithm
- Quick and situ-aware spatiotemporal scheduling for shipbuilding manufacturing
This page was built for publication: A metaheuristic algorithm to transporter scheduling for assembly blocks in a shipyard considering precedence and cooperating constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2296473)