Multi-objective open shop scheduling by considering human error and preventive maintenance
DOI10.1016/j.apm.2018.11.015zbMath1481.90189OpenAlexW2901460396WikidataQ128930843 ScholiaQ128930843MaRDI QIDQ2307240
Publication date: 27 March 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2018.11.015
makespanopen shop schedulingavailabilitymaintenance activityhuman errormulti-objective non-linear mixed integer programming
Mixed integer programming (90C11) Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (4)
Cites Work
- Unnamed Item
- The third comprehensive survey on scheduling problems with setup times/costs
- Flexible open shop scheduling problem to minimize makespan
- Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
- A contribution and new heuristics for open shop scheduling
- Solving an integrated job-shop problem with human resource constraints
- Dense open-shop schedules with release times
- A new heuristic for open shop total completion time problem
- A projective algorithm for preemptive open shop scheduling with two multiprocessor groups
- Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems
- Scheduling subject to resource constraints: Classification and complexity
- An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times
- A hybrid imperialist competitive algorithm for minimizing makespan in a multi-processor open shop
- An integrated fuzzy DEA-fuzzy simulation approach for optimization of operator allocation with learning effects in multi products CMS
- Modelling worker reliability with learning and fatigue
- Considering human error in optimizing production and corrective and preventive maintenance policies for manufacturing systems
- Single-machine scheduling problems with machine aging effect and an optional maintenance activity
- Unique NSGA-II and MOPSO algorithms for improved dynamic cellular manufacturing systems considering human factors
- A network flow-based method to solve performance cost and makespan open-shop scheduling problems with time-windows
- Simulated annealing and genetic algorithms for minimizing mean flow time in an open shop
- Fifty years of scheduling: a survey of milestones
- Open Shop Scheduling to Minimize Finish Time
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
This page was built for publication: Multi-objective open shop scheduling by considering human error and preventive maintenance