A model for foamed cementing of oil and gas wells
From MaRDI portal
Publication:2324430
Recommendations
- Mud removal and cement placement during primary cementing of an oil well. Laminar non-Newtonian displacements in an eccentric annular Hele-Shaw cell
- Primary cementing of horizontal wells. Displacement flows in eccentric horizontal annuli. Part 1. Experiments
- Primary cementing of oil and gas wells in turbulent and mixed regimes
- Two-dimensional computational simulation of eccentric annular cementing displacements
- Kinematic instabilities in two-layer eccentric annular flows. I: Newtonian fluids
Cites work
- Analysis of a regularized Bingham model with pressure-dependent yield stress
- scientific article; zbMATH DE number 3245332 (Why is no real title available?)
- Mud removal and cement placement during primary cementing of an oil well. II: Steady-state displacements
- Mud removal and cement placement during primary cementing of an oil well. Laminar non-Newtonian displacements in an eccentric annular Hele-Shaw cell
- Primary cementing of oil and gas wells in turbulent and mixed regimes
- Two-dimensional computational simulation of eccentric annular cementing displacements
- Visco-plastic fluid displacements in near-vertical narrow eccentric annuli: prediction of travelling-wave solutions and interfacial instability
- Viscoplastic fluid displacements in horizontal narrow eccentric annuli: stratification and travelling wave solutions
Cited in
(3)
This page was built for publication: A model for foamed cementing of oil and gas wells
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2324430)