Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
From MaRDI portal
Publication:2336415
DOI10.1155/2014/418689zbMath1442.90086OpenAlexW2016395024WikidataQ59051310 ScholiaQ59051310MaRDI QIDQ2336415
Zun Wang, Xiao-Ping Li, Anne Goodchild, Dan-dan Wang
Publication date: 19 November 2019
Published in: Journal of Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2014/418689
Cites Work
- A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
- Production scheduling with alternative process plans
- Container sequencing for quay cranes with internal reshuffles
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Heuristics for multimode scheduling problems with dedicated resources
- Constraint propagation techniques for the disjunctive scheduling problem
- Modeling and solving rich quay crane scheduling problems
- Integrated scheduling of crane handling and truck transportation in a maritime container terminal
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Operations research at container terminals: a literature update
- Crane scheduling with spatial constraints
- Scheduling the production of rolling ingots: industrial context, model, and solution method
This page was built for publication: Double girder bridge crane with double cycling: scheduling strategy and performance evaluation