Construction schedule optimization for high arch dams based on real-time interactive simulation
From MaRDI portal
Publication:2351289
Recommendations
- Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects
- scientific article; zbMATH DE number 5231312
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
- Evaluation of cracking potential for concrete arch dam based on simulation feedback analysis
- Research for global coordinating method of large equipment scheduling in construction site
Cited in
(4)- Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
- scientific article; zbMATH DE number 2006560 (Why is no real title available?)
- scientific article; zbMATH DE number 5231312 (Why is no real title available?)
This page was built for publication: Construction schedule optimization for high arch dams based on real-time interactive simulation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2351289)