Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems
From MaRDI portal
(Redirected from Publication:2355834)
Recommendations
- Stochastic dynamic programming applied to hydrothermal power systems operation planning based on the convex hull algorithm
- Stochastic optimization for hydro-thermal power systems
- Long- and Medium-term Operations Planning and Stochastic Modelling in Hydro-dominated Power Systems Based on Stochastic Dual Dynamic Programming
- Multi-stage stochastic optimization applied to energy planning
- Optimizing Long‐term Hydro‐power Production Using Markov Decision Processes
Cites work
- scientific article; zbMATH DE number 3126094 (Why is no real title available?)
- scientific article; zbMATH DE number 663895 (Why is no real title available?)
- Analysis of stochastic dual dynamic programming method
- Dynamic sampling algorithms for multi-stage stochastic programs with risk aversion
- Introduction to algorithms
- Lock-free parallel dynamic programming
- Modeling the operation of multireservoir systems using decomposition and stochastic dynamic programming
- On stochastic dynamic programming for solving large-scale planning problems under uncertainty
- Optimization of a large-scale water reservoir network by stochastic dynamic programming with efficient state space discretization
- Risk neutral and risk averse stochastic dual dynamic programming method
- Stochastic dynamic programming applied to hydrothermal power systems operation planning based on the convex hull algorithm
- The quickhull algorithm for convex hulls
Cited in
(13)- Interior point method for long-term generation scheduling of large-scale hydrothermal systems
- Stochastic dynamic programming applied to hydrothermal power systems operation planning based on the convex hull algorithm
- Combined scheduling and capacity planning of electricity-based ammonia production to integrate renewable energies
- A gradient-based algorithm for non-smooth constrained optimization problems governed by discrete-time nonlinear equations with application to long-term hydrothermal optimal scheduling control
- On parallelization of a stochastic dynamic programming algorithm for solving large-scale mixed \(0-1\) problems under uncertainty
- Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
- A parallel branch-and-fix coordination based matheuristic algorithm for solving large sized multistage stochastic mixed 0-1 problems
- Stochastic simulation and Monte Carlo methods applied to the assessment of hydro-thermal generating system operation
- Long- and Medium-term Operations Planning and Stochastic Modelling in Hydro-dominated Power Systems Based on Stochastic Dual Dynamic Programming
- A parallel implementation of unscheduled flow control in interconnected power systems
- Parallel computational optimization in operations research: a new integrative framework, literature review and research directions
- Hybrid simplicial-randomized approximate stochastic dynamic programming for multireservoir optimization
- Parallel dynamic water supply scheduling in a cluster of computers
This page was built for publication: Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2355834)