Single-server parallel-machine scheduling with loading and unloading times
From MaRDI portal
Publication:2355978
Recommendations
- Parallel machine scheduling with a single server: loading and unloading
- An optimal preemptive algorithm for the single-server parallel-machine scheduling with loading and unloading times
- Scheduling on two parallel machines with two dedicated servers
- LS and LPT algorithms for two-machine scheduling with a loading server and an unloading server
- Online algorithms for scheduling two parallel machines with a single server
Cites work
- A branch-and-price algorithm for the general case of scheduling parallel machines with a single server
- An approximation algorithm for parallel machine scheduling with a common server
- Asymptotically optimal schedules for single-server flow shop problems with setup costs and times
- Bounds for Certain Multiprocessing Anomalies
- Complexity results for flow-shop problems with a single server
- Complexity results for parallel machine problems with a single server
- Design and operational issues in AGV-served manufacturing systems
- Equal processing and equal setup time cases of scheduling parallel machines with a single server
- MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server
- On-line scheduling of two parallel machines with a single server
- Online LPT algorithms for parallel machines scheduling with a single server
- Parallel machine scheduling problems with a single server
- Parallel machine scheduling with a common server
- Parallel machine scheduling with multiple unloading servers
- Scheduling a single server in a two-machine flow shop
- Scheduling parallel machines with a single server: Some solvable cases and heuristics
- Scheduling two parallel machines with a single server: the general case
- Scheduling two parallel semiautomatic machines to minimize machine interference
- Scheduling with multiple servers
- Sequencing and scheduling in robotic cells: recent developments
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
Cited in
(15)- A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server
- Online algorithms for scheduling two parallel machines with a single server
- Parallel machine scheduling with a single server: loading and unloading
- An optimal preemptive algorithm for the single-server parallel-machine scheduling with loading and unloading times
- Scheduling jobs with equal processing times and a single server on parallel identical machines
- LS and LPT algorithms for two-machine scheduling with a loading server and an unloading server
- Server scheduling on parallel dedicated machines with fixed job sequences
- Scheduling on two parallel machines with two dedicated servers
- General variable neighborhood search for the parallel machine scheduling problem with two common servers
- Scheduling with machine conflicts
- Self-adaptive general variable neighborhood search algorithm for parallel machine scheduling with unrelated servers
- Minimizing the makespan on two parallel machines with a common server in charge of loading and unloading operations
- A reduction approach for the parallel machine scheduling problem with a separate server for loading and unloading operations
- Robotic flow shop scheduling problem with combined buffer conditions
- Parallel machine scheduling with multiple unloading servers
This page was built for publication: Single-server parallel-machine scheduling with loading and unloading times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2355978)