The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
DOI10.1016/J.EJOR.2013.05.031zbMATH Open1317.90121OpenAlexW2022025030MaRDI QIDQ2356207FDOQ2356207
Authors: Anis Gharbi, Talel Ladhari, Mohamed Kais Msakni, Mehdi Serairi
Publication date: 29 July 2015
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2013.05.031
Recommendations
- Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times
- A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm
- Lower bounds for the two-machine flow shop problem with time delays
- Lower bounds for minimizing total completion time in a two-machine flow shop
lower boundsschedulingLagrangian relaxationtotal completion timetwo-machine flowshopsequence-independent setup times
Cites Work
- An efficient cost scaling algorithm for the assignment problem
- Title not available (Why is that?)
- The two-machine total completion time flow shop problem
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
- Stronger Lagrangian bounds by use of slack variables: Applications to machine scheduling problems
- A survey of scheduling problems with setup times or costs
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Improving the preemptive bound for the one-machine dynamic total completion time scheduling problem.
- The significance of reducing setup times/setup costs
- Permutation flow shops with exact time lags to minimise maximum lateness
- Complexity results for flow-shop problems with a single server
- A Branch and Bound Algorithm for the Total Weighted Tardiness Problem
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm
- Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
- Revisiting branch and bound search strategies for machine scheduling problems
- Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shop
- Lower bounds for minimizing total completion time in a two-machine flow shop
- A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
- Title not available (Why is that?)
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
- Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times
Cited In (12)
- Lower bounds for the two-machine flow shop problem with time delays
- Title not available (Why is that?)
- Two-machine job shop problem with a single server and sequence-independent non-anticipatory set-up times
- Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times
- The third comprehensive survey on scheduling problems with setup times/costs
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- The two-machine flowshop total completion time problem: branch-and-bound algorithms based on network-flow formulation
- An assignment-based lower bound for a class of two-machine flow shop problems
- Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times
- A mixed integer programming approach for the single machine problem with unequal release dates
- Solving permutation flow shop scheduling problem with sequence-independent setup time
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times
This page was built for publication: The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2356207)