Hierarchical models for multi-project planning and scheduling
From MaRDI portal
Publication:2366089
DOI10.1016/0377-2217(93)90185-PzbMath0779.90046MaRDI QIDQ2366089
Publication date: 29 June 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (36)
A decomposition approach for a resource constrained scheduling problem ⋮ Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology ⋮ A multi-project management framework for new product development ⋮ Constrained multi-project planning problems: A Lagrangean decomposition approach ⋮ A decomposition approach in a DSS for a resource constrained scheduling problem ⋮ Multi-mode resource constrained multi-project scheduling and resource portfolio problem ⋮ Resource loading with time windows ⋮ Scheduling independent tasks with multiple modes ⋮ Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting ⋮ An exact algorithm for project scheduling with multiple modes ⋮ A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows ⋮ Integrated multi-project planning and scheduling -- a multiagent approach ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers ⋮ Resource-constrained project scheduling: A survey of recent developments. ⋮ Multi-project scheduling with two-stage decomposition ⋮ Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances ⋮ Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology ⋮ A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling ⋮ Re-planning support system for make-to-order production with reserved resources ⋮ Reactive scheduling in the multi-mode RCPSP ⋮ A review of the contribution of operational research to project management ⋮ The multi-mode resource-constrained project scheduling problem with generalized precedence relations ⋮ A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes ⋮ A framework for an interactive project scheduling system under limited resources ⋮ Project network models with discounted cash flows a guided tour through recent developments ⋮ A note on ``Hierarchical models for multi-project planning and scheduling ⋮ A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem ⋮ A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem ⋮ Heuristics for multimode scheduling problems with dedicated resources ⋮ Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm ⋮ Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization ⋮ Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms
Cites Work
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Scheduling subject to resource constraints: Classification and complexity
- A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- DAGEN: A generator of testsets for project activity nets
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Optimal resource profiles for program scheduling
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- Project scheduling: The effects of problem structure on heuristic performance
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Cash Flows in Networks
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- An Algorithm for Project (Job) Sequencing with Resource Constraints
This page was built for publication: Hierarchical models for multi-project planning and scheduling