Optimal periodic scheduling of multipurpose batch plants
From MaRDI portal
Publication:2368100
DOI10.1007/BF02023176zbMath0775.90219MaRDI QIDQ2368100
Publication date: 23 August 1993
Published in: Annals of Operations Research (Search for Journal in Brave)
90C11: Mixed integer programming
90C05: Linear programming
90B35: Deterministic scheduling theory in operations research
90B30: Production models
90-08: Computational methods for problems pertaining to operations research and mathematical programming
Related Items
Throughput-optimal sequences for cyclically operated plants, Mathematical model for scheduling operations in cascaded continuous processing units, Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant, MIP modelling of changeovers in production planning and scheduling problems, Scheduling of industrial distribution manifolds with pre-conditions, A cyclic approach to large-scale short-term planning in chemical batch production, Automatic generation of production scheduling models in single stage multi-product batch plants: some examples, A complex time based construction heuristic for batch scheduling problems in the chemical industry, Modeling and Managing Uncertainty in Process Planning and Scheduling
Uses Software