Optimal testing and repairing a failed series system
DOI10.1007/S10878-006-9633-0zbMATH Open1160.90473OpenAlexW2086968593MaRDI QIDQ2369986FDOQ2369986
A. Oulamara, M. Y. Kovalyov, Marie-Claude Portmann
Publication date: 21 June 2007
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-006-9633-0
OptimizationFully polynomial time approximation schemeFailure diagnosisPseudo-boolean functionsTest and repair policies
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Integer programming (90C10)
Cites Work
Cited In (7)
- Exact and heuristic approaches to detect failures in failed \(k\)-out-of-\(n\) systems
- Single machine scheduling with assignable due dates to minimize maximum and total late work
- A multicriteria approach to failure diagnosis in a series system
- Heuristic testing procedures for general coherent systems
- Lot-size scheduling of a single product on unrelated parallel machines
- Scheduling results applicable to decision-theoretic troubleshooting
- The list scheduling algorithm for scheduling unreliable jobs on two parallel machines
Recommendations
- Optimal repair allocation in a series system expected discounted operation time criterion π π
- Optimal Repair Allocation in a Series System π π
- OPTIMAL REPAIR OF A SERIES SYSTEM WITH FIXED REPAIR TIMES π π
- The design of optimum component test plans in the demonstration of a series system reliability π π
- Component testing of repairable systems in multistage missions π π
This page was built for publication: Optimal testing and repairing a failed series system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2369986)