A hybrid heuristic to solve the parallel machines job-shop scheduling problem
From MaRDI portal
Publication:2378080
DOI10.1016/J.ADVENGSOFT.2008.03.020zbMATH Open1156.90370OpenAlexW2148858970MaRDI QIDQ2378080FDOQ2378080
Authors: Yanyan Li
Publication date: 6 January 2009
Published in: Advances in Engineering Software (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.advengsoft.2008.03.020
Recommendations
- Scheduling job shop associated with multiple routings with genetic and ant colony heuristics
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
- Solving flexible job shop scheduling problem by genetic algorithm
- Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
- An improved genetic algorithm for the distributed and flexible job-shop scheduling problem
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- An ant colony optimization algorithm for shop scheduling problems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- The Complexity of Flowshop and Jobshop Scheduling
- An effective hybrid optimization strategy for job-shop scheduling problems
- Title not available (Why is that?)
- A Fast Taboo Search Algorithm for the Job Shop Problem
- Algorithms for Solving Production-Scheduling Problems
- An alternative framework to Lagrangian relaxation approach for job shop scheduling.
- A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
- Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
- The job shop scheduling problem: Conventional and new solution techniques
- Deterministic job-shop scheduling: Past, present and future
- A hybrid metaheuristic for the resource-constrained project scheduling problem
- Reactive scheduling in a dynamic and stochastic FMS environment
- A SHIFTING BOTTLENECK APPROACH FOR A PARALLEL-MACHINE FLOWSHOP SCHEDULING PROBLEM
- Dynamic scheduling of FMS using a real-time genetic algorithm
Cited In (9)
- A job-shop scheduling approach for optimising sugarcane rail operations
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem
- A new heuristic algorithm for the machine scheduling problem with job delivery coordination
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- Universal shop scheduling method for manufacturing system with evolution algorithm
- A neural network algorithm for servicing jobs with sequential and parallel machines
- Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem
- Scheduling job shop associated with multiple routings with genetic and ant colony heuristics
- Fast parallel heuristics for the job shop scheduling problem
This page was built for publication: A hybrid heuristic to solve the parallel machines job-shop scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2378080)