Integration of equipment planning and project scheduling
From MaRDI portal
Publication:2384850
DOI10.1016/j.ejor.2006.09.104zbMath1141.90424OpenAlexW2039440302MaRDI QIDQ2384850
Publication date: 10 October 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.09.104
heuristicsmixed integer programmingidle timebinary switching operationCrashing activitiesenhanced forward loadingtransition cost
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Project scheduling and equipment planning with random breakdowns ⋮ A new MIP model for mine equipment scheduling by minimizing maintenance cost
Uses Software
Cites Work
- Unnamed Item
- Scheduling subject to resource constraints: Classification and complexity
- The traveling salesman problem: An overview of exact and approximate algorithms
- Project network models with discounted cash flows a guided tour through recent developments
- Activity nets: A guided tour through some recent developments
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Tabu search in audit scheduling
- An Optimal Solution Method for Large-Scale Multiple Traveling Salesmen Problems
- A Random Activity Network Generator
This page was built for publication: Integration of equipment planning and project scheduling