Polynomial time algorithms for the UET permutation flowshop problem with time delays
From MaRDI portal
Publication:2384903
DOI10.1016/j.cor.2006.03.018zbMath1141.90020MaRDI QIDQ2384903
Alix Munier Kordon, Djamal Rebaine
Publication date: 10 October 2007
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2006.03.018
90C60: Abstract computational complexity for mathematical programming problems
90B35: Deterministic scheduling theory in operations research
Related Items
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints, Analysis of heuristics for the UET two-machine flow shop problem with time delays, Unnamed Item
Cites Work
- Unnamed Item
- Unnamed Item
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Permutation flowshop scheduling problems with maximal and minimal time lags
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- Flowshop and Jobshop Schedules: Complexity and Approximation