Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines
From MaRDI portal
Publication:2387249
DOI10.1016/J.COR.2004.01.003zbMATH Open1068.90060OpenAlexW2078463045MaRDI QIDQ2387249FDOQ2387249
Authors: Chinyao Low
Publication date: 2 September 2005
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2004.01.003
Recommendations
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
- scientific article; zbMATH DE number 2086794
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal
- New heuristics for no-wait flowshops to minimize makespan.
- Scheduling in flowshops to minimize total tardiness of jobs
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Global lower bounds for flow shops with multiple processors
- A fast tabu search algorithm for the permutation flow-shop problem
- Scheduling on uniform parallel machines to minimize maximum lateness
- Scheduling parallel machines to minimize total weighted and unweighted tardiness
- Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
- Heuristic approaches for \(n/m/F/\sum C_i\) scheduling problems
- A tabu search approach for the flow shop scheduling problem
- The permutation flow shop with buffers: A tabu search approach
- Heuristics for scheduling in a flow shop with multiple processors
- Early/tardy scheduling with sequence dependent setups on uniform parallel machines
- Scheduling under a common due-date on parallel unrelated machines
- Local search algorithms for the multiprocessor flow shop scheduling problem
- The flow shop with parallel machines: A tabu search approach
- Two branch and bound algorithms for the permutation flow shop problem
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal
- Title not available (Why is that?)
- Sequency on two and three machines with setup, processing and removal times separated
- Sequencing n jobs on two machines with setup, processing and removal times separated
- Flowshop scheduling with identical jobs and uniform parallel machines
- Local search heuristics for two-stage flow shop problems with secondary criterion
Cited In (27)
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
- Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines
- A simulated annealing approach for reliability-based chance-constrained programming
- Design of supply chain networks with multi-phased discount price and service level: formulation, complexity, and algorithm
- A simulated annealing approach to minimize the maximum lateness on uniform parallel machines
- Exact mathematical formulations and metaheuristic algorithms for production cost minimization: a case study of the cable industry
- Scheduling algorithms for real-time computing systems admitting simulation models
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
- Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines
- The application of the simulated annealing algorithm to the solution of the \(n/m/C_{\max}\) flowshop problem
- The hybrid flow shop scheduling problem
- A discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraints
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
- Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
- A survey of scheduling problems with setup times or costs
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- An integrated approach for modeling and solving the scheduling problem of container handling systems
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
- A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem
- Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises
- Optimizing the production schedule of an agricultural cooperative: a case study
- An effective scheduling method to single-arm cluster tools for processing multiple wafer types
- Minimizing the number of late jobs for the permutation flowshop problem with secondary resources
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
- Metaheuristic algorithms for the hybrid flowshop scheduling problem
This page was built for publication: Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines