An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework
From MaRDI portal
Publication:2393122
DOI10.1007/s00291-012-0304-5zbMath1282.90064MaRDI QIDQ2393122
Publication date: 7 August 2013
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-012-0304-5
90B25: Reliability, availability, maintenance, inspection in operations research
90B30: Production models
Related Items
Cites Work
- Unnamed Item
- A polynomial time algorithm for solving a quality control Station configuration problem
- Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach
- Inspection resource assignment in a multistage manufacturing system with an inspection error model
- Optimizing the quality control station configuration
- Shortest Route Models for the Allocation of Inspection Effort on a Production Line