Two-agent scheduling of time-dependent jobs
From MaRDI portal
Publication:2410089
Recommendations
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- A two-agent scheduling problem with deterioration
- Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria
- Single machine two-agent scheduling with deteriorating jobs
- Two-agent scheduling to minimize the maximum cost with position-dependent jobs
Cites work
- A concise survey of scheduling with time-dependent processing times
- A multiple-criterion model for machine scheduling
- A note on single-machine scheduling with decreasing time-dependent job processing times
- A note on the complexity of the problem of two-agent scheduling on a single machine
- A note on the scheduling with two families of jobs
- Competitive two-agent scheduling and its applications
- Complexity of scheduling tasks with time-dependent execution times
- scientific article; zbMATH DE number 1634827 (Why is no real title available?)
- scientific article; zbMATH DE number 7618570 (Why is no real title available?)
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Multiagent scheduling. Models and algorithms
- Multicriteria scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Deteriorating Jobs on a Single Processor
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- Scheduling Problems with Two Competing Agents
- Scheduling start time dependent jobs to minimize the total weighted completion time
- Scheduling two agents with controllable processing times
- Scheduling with time dependent processing times: Review and extensions
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Two-agent single-machine scheduling problems under increasing linear deterioration
Cited in
(12)- Two-agent scheduling to minimize the maximum cost with position-dependent jobs
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems
- Scheduling with release dates and preemption to minimize multiple max-form objective functions
- Two-agent scheduling problems with the general position-dependent processing time
- SCHEDULING TWO SALESMEN IN A NETWORK
- Scheduling Problems with Two Competing Agents
- A time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agents
- Two-agent single-machine scheduling of jobs with time-dependent processing times and ready times
- scientific article; zbMATH DE number 7113489 (Why is no real title available?)
- Theory and methodology of time-dependent scheduling: past, present and future
This page was built for publication: Two-agent scheduling of time-dependent jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2410089)