Approximation algorithms for scheduling multiple two-stage flowshops
From MaRDI portal
Publication:2412433
Recommendations
- On scheduling multiple two-stage flowshops
- Approximation algorithms on multiple two-stage flowshops
- Improved approximation algorithms for two-stage flowshops scheduling problem
- A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops
- Approximation algorithms for two-stage flexible flow shop scheduling
Cited in
(23)- Approximability of flow shop scheduling
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem
- Approximation algorithms on multiple two-stage flowshops
- On scheduling multiple two-stage flowshops
- Improved approximation algorithms for two-stage flexible flow shop scheduling
- Scheduling multiple two-stage flowshops with a deadline
- Scheduling on multiple two-stage flowshops with a deadline
- Streaming algorithms for multitasking scheduling with shared processing
- Improved approximation algorithms for two-stage flowshops scheduling problem
- Approximation algorithms for two-stage flexible flow shop scheduling
- On scheduling inclined jobs on multiple two-stage flowshops
- A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops
- A data intensive heuristic approach to the two-stage streaming scheduling problem
- Scheduling two-stage jobs on multiple flowshops
- A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint
- Approximating the non-contiguous multiple organization packing problem
- Linear time algorithms for multiple cluster scheduling and multiple strip packing
- scientific article; zbMATH DE number 1979499 (Why is no real title available?)
- On Approximation Algorithms for Two-Stage Scheduling Problems
- On scheduling multiple parallel two-stage flowshops with Johnson's rule
- Applying Johnson's rule in scheduling multiple parallel two-stage flowshops
- A polynomial-time approximation scheme for an arbitrary number of parallel identical multi-stage flow-shops
- Complexity and algorithms for two-stage flexible flowshop scheduling with availability constraints
This page was built for publication: Approximation algorithms for scheduling multiple two-stage flowshops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2412433)