Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production
From MaRDI portal
Publication:2426524
DOI10.1016/j.ejor.2007.02.017zbMath1168.90666MaRDI QIDQ2426524
Publication date: 22 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.02.017
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A multicriteria fuzzy linear programming method for water supply system development planning
- Linear programming with fuzzy parameters: an interactive method resolution
- A chance-constrained approach to stochastic line balancing problem
- Ranking fuzzy numbers in the setting of possibility theory
- Interactive multiple objective programming subject to flexible constraints
- Systems of linear fuzzy constraints
- Fuzzy programming and linear programming with several objective functions
- Fuzzy sets as a basis for a theory of possibility
- Chance constrained programming with fuzzy parameters
- A joint chance-constrained programming model with row dependence
- The single machine ready time scheduling problem with fuzzy processing times