Scheduling of pipelined operator graphs
From MaRDI portal
Publication:2434287
DOI10.1007/s10951-011-0225-1zbMath1280.68084WikidataQ59567568 ScholiaQ59567568MaRDI QIDQ2434287
Petra Schuurman, Hans L. Bodlaender, Gerhard J. Woeginger
Publication date: 5 February 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-011-0225-1
68P15: Database theory
68R10: Graph theory (including graph drawing) in computer science
90B35: Deterministic scheduling theory in operations research
68M20: Performance evaluation, queueing, and scheduling in the context of computer systems
68W25: Approximation algorithms
Related Items
Balanced partitions of trees and applications, Structural parameters, tight bounds, and approximation for \((k, r)\)-center, Balanced tree partition problems with virtual nodes
Cites Work
- Multiprocessor scheduling with communication delays
- Approximation schemes for scheduling on parallel machines
- A partial k-arboretum of graphs with bounded treewidth
- Integer Programming with a Fixed Number of Variables
- Deterministic Dcomposition of Recursive Graph Classes
- Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems
- When Does a Dynamic Programming Formulation Guarantee the Existence of a Fully Polynomial Time Approximation Scheme (FPTAS)?
- A Linear-Time Algorithm for Finding Tree-Decompositions of Small Treewidth
- Unnamed Item
- Unnamed Item
- Unnamed Item