Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
From MaRDI portal
Publication:2434315
DOI10.1007/s10951-013-0311-7zbMath1280.90076MaRDI QIDQ2434315
Publication date: 5 February 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-013-0311-7
90C29: Multi-objective and goal programming
90B35: Deterministic scheduling theory in operations research
Related Items
Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs, Pareto-optimal Algorithms for Scheduling Games on Parallel-batching Machines with Activation Cost, Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work, Rescheduling with new orders and general maximum allowable time disruptions, A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling, Rescheduling problems with allowing for the unexpected new jobs arrival, Rescheduling due to machine disruption to minimize the total weighted completion time
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Two machine scheduling under disruptions with transportation considerations
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption
- One-machine rescheduling heuristics with efficiency and stability as criteria
- Rescheduling on a single machine with part-type dependent setup times and deadlines
- Rescheduling of identical parallel machines under machine eligibility constraints.
- Executing production schedules in the face of uncertainties: a review and some future directions
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Multicriteria scheduling
- Rescheduling for Multiple New Orders
- Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
- Rescheduling for Job Unavailability
- RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN
- Rescheduling for New Orders
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Rescheduling strategies for minimizing total weighted tardiness in complex job shops