A weighted modified due date rule for sequencing to minimize weighted tardiness
From MaRDI portal
Publication:2464422
DOI10.1023/B:JOSH.0000031421.64487.95zbMath1154.90465MaRDI QIDQ2464422
Publication date: 20 December 2007
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/b:josh.0000031421.64487.95
90B35: Deterministic scheduling theory in operations research
Related Items
Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times, Heuristic approaches for scheduling jobs in large-scale flexible job shops, Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming, Hybrid backward and forward dynamic programming based Lagrangian relaxation for single machine scheduling, On the flexibility of a decision theory-based heuristic for single machine scheduling, Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines, Extended GRASP for the job shop scheduling problem with total weighted tardiness objective, Dispatching heuristics for the single machine weighted quadratic tardiness scheduling problem, Minimizing mean weighted tardiness in unrelated parallel machine scheduling with reinforcement learning, New heuristics for total tardiness minimization in a flexible flowshop, A survey of scheduling with parallel batch (p-batch) processing, Aversion scheduling in the presence of risky jobs, Genetic programming-based hyper-heuristic approach for solving dynamic job shop scheduling problem with extended technical precedence constraints