Single-job lot streaming in m - 1 two-stage hybrid flowshops
From MaRDI portal
Publication:2467262
Recommendations
Cites work
- A survey of scheduling problems with setup times or costs
- Basic Techniques for Lot Streaming
- Flow shop scheduling with lot streaming
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
- Lot streaming in the two-machine flow shop with setup times
- Lot streaming in three-stage production processes
- Lot streaming with detached setups in three-machine flow shops
- Optimal lot streaming for multiple products in a two-machine flow shop
- Optimal streaming of a single job in a two-stage flow shop
- Structural properties of lot streaming in a flow shop
- The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
Cited in
(5)- A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem
- Lot streaming multiple jobs in a flow shop
- Single-lot, lot-streaming problem for a \(1 + m\) hybrid flow shop
- The hybrid flow shop scheduling problem
- Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop
This page was built for publication: Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2467262)