Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
DOI10.1016/J.EJOR.2006.06.069zbMATH Open1137.90508OpenAlexW1999456927MaRDI QIDQ2467268FDOQ2467268
Grzegorz Waligóra, Jan Węglarz, Marek Mika
Publication date: 21 January 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.069
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- PSPLIB -- a project scheduling problem library
- Future paths for integer programming and links to artificial intelligence
- Tabu Search—Part I
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Scheduling subject to resource constraints: Classification and complexity
- Project scheduling. A research handbook.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Tabu Search—Part II
- Tabu Search Applied to the Quadratic Assignment Problem
- Simulated annealing for multi-mode resource-constrained project scheduling
- An exact algorithm for project scheduling with multiple modes
Cited In (24)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Resource-constrained project scheduling with activity splitting and setup times
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem
- Optimization problem of allocating limited project resources with separable constraints
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
- A survey of variants and extensions of the resource-constrained project scheduling problem
- MIP-based solution approaches for multi-site resource-constrained project scheduling
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- A branch and bound algorithm for project scheduling problem with spatial resource constraints
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
- A survey of scheduling problems with setup times or costs
- Modelling and solving generalised operational surgery scheduling problems
- Local search approaches for the test laboratory scheduling problem with variable task grouping
- Multi-project scheduling problem under shared multi-skill resource constraints
- Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem
- Heuristics for periodical batch job scheduling in a MapReduce computing framework
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies
Uses Software
This page was built for publication: Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2467268)