Meta-heuristics for stable scheduling on a single machine
From MaRDI portal
Publication:2468477
DOI10.1016/j.cor.2006.10.017zbMath1177.90142OpenAlexW2135975656MaRDI QIDQ2468477
Francisco Ballestín, Roel Leus
Publication date: 23 January 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2006.10.017
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance ⋮ A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling ⋮ A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms ⋮ Self-imposed time windows in vehicle routing problems
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A classification of predictive-reactive project scheduling procedures
- When it is worthwhile to work with the stochastic RCPSP?
- Scheduling for stability in single-machine production systems
- One-machine rescheduling heuristics with efficiency and stability as criteria
- Robust discrete optimization and its applications
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Match-up scheduling under a machine breakdown
- Robust scheduling of metaprograms
- The construction of stable project baseline schedules
- Executing production schedules in the face of uncertainties: a review and some future directions
- The complexity of machine scheduling for stability with a single disrupted job
- Scheduling of Project Networks by Job Assignment
- Matchup Scheduling with Multiple Resources, Release Dates and Disruptions
- Predictable scheduling of a single machine with breakdowns and sensitive jobs
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- Adaptive memory programming: a unified view of metaheuristics