A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times
From MaRDI portal
Publication:2471235
Recommendations
- A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine
- The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times
- A branch and bound method for the job-shop problem with sequence-dependent setup times
- Minimizing sum of completion times on a single machine with sequence-dependent family setup times
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness
Cites work
- A concise survey of scheduling with time-dependent processing times
- A dynamic vehicle routing problem with time-dependent travel times
- A Polyhedral Approach to the Asymmetric Traveling Salesman Problem
- A restricted dynamic programming heuristic algorithm for the time dependent traveling salesman problem
- Integer Programming Formulation of Traveling Salesman Problems
- Makespan minimization in single-machine scheduling with step-deterioration of processing times
- Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
- Scheduling jobs under simple linear deterioration
- Scheduling with time dependent processing times: Review and extensions
- Single machine scheduling with start time dependent processing times: Some solvable cases
- Single machine scheduling with step-deteriorating processing times
- Single-machine scheduling with time window-dependent processing times
- The Time-Dependent Traveling Salesman Problem and Its Application to the Tardiness Problem in One-Machine Scheduling
- Time dependent vehicle routing problem with a multi ant colony system
- Time Dependent Vehicle Routing Problems: Formulations, Properties and Heuristic Algorithms
Cited in
(12)- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
- Distributionally robust single machine scheduling with the total tardiness criterion
- An integer programming approach for the time-dependent traveling salesman problem with time windows
- A comparison of algorithms for finding an efficient theme park tour
- Stochastic single machine scheduling problem as a multi-stage dynamic random decision process
- An enhanced lower bound for the time-dependent travelling salesman problem
- Solving the single crane scheduling problem at rail transshipment yards
- On path ranking in time-dependent graphs
- Solving the time dependent minimum tour duration and delivery man problems with dynamic discretization discovery
- The third comprehensive survey on scheduling problems with setup times/costs
- A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine
- The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times
This page was built for publication: A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2471235)