Batch processing with interval graph compatibilities between tasks
From MaRDI portal
Publication:2476244
Recommendations
- Scheduling on a batch processing machine with split compatibility graphs
- Scheduling on a batch machine with job compatibilities
- Scheduling a batch processing machine with bipartite compatibility graphs
- Online algorithms for scheduling on batch processing machines with interval graph compatibilities between jobs
- Dynamic scheduling on a single batch processing machine with split compatibility graphs
Cites work
- Bounded vertex colorings of graphs
- Combinatorial optimization. Polyhedra and efficiency (3 volumes)
- Complexity results for single-machine problems with positive finish-start time-lags
- Dynamic scheduling on a single batch processing machine with split compatibility graphs
- Geometric algorithms and combinatorial optimization
- scientific article; zbMATH DE number 3859178 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Restrictions of graph partition problems. I
- Scheduling a batch processing machine with bipartite compatibility graphs
- Scheduling a batching machine
- Scheduling Interval-Ordered Tasks
- Scheduling on a batch machine with job compatibilities
- Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime
- Scheduling with batching: A review
- The mutual exclusion scheduling problem for permutation and comparability graphs.
Cited in
(41)- Scheduling hybrid flowshop with parallel batching machines and compatibilities
- The vertex coloring problem and its generalizations
- Weighted coloring on planar, bipartite and split graphs: Complexity and approximation
- Scheduling with undirected graphs: motivations and reviews
- Models and heuristic algorithms for a weighted vertex coloring problem
- Dynamic scheduling on a single batch processing machine with split compatibility graphs
- Scheduling a batch processing machine with bipartite compatibility graphs
- An optimal online algorithm for the parallel-batch scheduling with job processing time compatibilities
- Scheduling of unit-length jobs with cubic incompatibility graphs on three uniform machines
- Order consolidation for batch processing
- Improved approximation algorithms for the max edge-coloring problem
- A PTAS for the horizontal rectangle stabbing problem
- Clique partitioning with value-monotone submodular cost
- Single-machine batch scheduling with job processing time compatibility
- Online algorithms for scheduling on batch processing machines with interval graph compatibilities between jobs
- A weakly robust PTAS for minimum clique partition in unit disk graphs
- A note on the Cornaz-Jost transformation to solve the graph coloring problem
- Bounded max-colorings of graphs
- A one-to-one correspondence between colorings and stable sets
- Minimizing total completion time on a batching machine with job processing time compatibilities
- A survey on vertex coloring problems
- Clique partitioning of interval graphs with submodular costs on the cliques
- Clique Clustering Yields a PTAS for max-Coloring Interval Graphs
- Parallel machine scheduling with a simultaneity constraint and unit-length jobs to minimize the makespan
- The lockmaster's problem
- Capacitated max-batching with interval graph compatibilities
- On the Maximum Edge Coloring Problem
- Structural and extremal properties of the hot rolling batches precedence graph
- Stabbing rectangles by line segments -- how decomposition reduces the shallow-cell complexity
- On the max-weight edge coloring problem
- A PTAS for the horizontal rectangle stabbing problem
- On the max coloring problem
- A best possible online algorithm for parallel-batch scheduling with kind release times and job compatibilities
- Clique clustering yields a PTAS for max-coloring interval graphs
- Online flexible busy time scheduling on heterogeneous machines
- Scheduling an unbounded batching machine with job processing time compatibilities
- Capacitated max-batching with interval graph compatibilities
- Partitioning a weighted partial order
- Flowshop scheduling problem with a batching machine and task compatibilities
- On maximizing the profit of a satellite launcher: selecting and scheduling tasks with time windows and setups
- Approximating the max-edge-coloring problem
This page was built for publication: Batch processing with interval graph compatibilities between tasks
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2476244)