A bi-objective coordination setup problem in a two-stage production system
From MaRDI portal
Publication:2482750
Recommendations
- Set-up coordination between two stages of a supply chain
- Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms
- scientific article; zbMATH DE number 1786138
- Coordination in a two-stage production system: complexity, conflict and cooperation
- Setup coordination between two stages of a production system: a multi-objective evolutionary approach
Cites work
- A lower bound on the Hamiltonian path completion number of a line graph
- A sequencing problem in the weaving industry
- Handbook of metaheuristics
- Heuristics for the flow line problem with setup costs
- scientific article; zbMATH DE number 2050711 (Why is no real title available?)
- Minimum Dominating Trail Set for Two-Terminal Series Parallel Graphs
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Multicriteria optimization
- Multicriteria scheduling. Theory, models and algorithms. Translated from the French by Henry Scott.
- Scheduling with batching: A review
- Set-up coordination between two stages of a supply chain
- Stochastic local search. Foundations and applications.
Cited in
(9)- Process selection and sequencing in a two-agents production system
- Set-up coordination between two stages of a supply chain
- Coordination in a two-stage production system: complexity, conflict and cooperation
- Microforecasting methods for fresh food supply chain management: a computational study
- Setup coordination between two stages of a production system: a multi-objective evolutionary approach
- Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms
- scientific article; zbMATH DE number 1786138 (Why is no real title available?)
- scientific article; zbMATH DE number 2083803 (Why is no real title available?)
- A lower bound on the Hamiltonian path completion number of a line graph
This page was built for publication: A bi-objective coordination setup problem in a two-stage production system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2482750)