Predictive-reactive scheduling on a single resource with uncertain future jobs
From MaRDI portal
Publication:2482799
DOI10.1016/j.ejor.2006.06.077zbMath1146.90033OpenAlexW2028667975MaRDI QIDQ2482799
Publication date: 24 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.077
Related Items (6)
A multi-objective optimization approach for exploring the cost and makespan trade-off in additive manufacturing ⋮ An anticipative scheduling approach with controllable processing times ⋮ Optimizing makespan and stability risks in job shop scheduling ⋮ Predictive-reactive strategy for identical parallel machine rescheduling ⋮ Predictive-reactive scheduling for single surgical suite subject to random emergency surgery ⋮ Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job
Cites Work
- Unnamed Item
- On the robust single machine scheduling problem
- A controlled search simulated annealing method for the single machine weighted tardiness problem
- Sequencing jobs on a single machine with a common due data and stochastic processing times
- One-machine rescheduling heuristics with efficiency and stability as criteria
- A survey of algorithms for the single machine total weighted tardiness scheduling problem
- A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling
- An Iterated Dynasearch Algorithm for the Single-Machine Total Weighted Tardiness Scheduling Problem
- Stochastic Scheduling with Release Dates and Due Dates
- Local Search Heuristics for the Single Machine Total Weighted Tardiness Scheduling Problem
- Predictable scheduling of a single machine with breakdowns and sensitive jobs
- Stability of queueing networks and scheduling policies
- Sensitivity analysis for scheduling problems
- Sensitivity analysis of scheduling algorithms
This page was built for publication: Predictive-reactive scheduling on a single resource with uncertain future jobs