Preemptive multiprocessor order scheduling to minimize total weighted flowtime
From MaRDI portal
Publication:2482817
Recommendations
- Scheduling orders for multiple product types to minimize total weighted completion time
- Minimizing total weighted completion time when scheduling orders in a flexible environment with uniform machines
- Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time
- scientific article; zbMATH DE number 6263704
- Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel
Cites work
- A note on the complexity of the concurrent open shop problem
- Batching in single operation manufacturing systems
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- Open shops with jobs overlap
- Open shops with jobs overlap -- revisited
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
- Order scheduling in an environment with dedicated resources in parallel
- Preemptive Scheduling with Due Dates
- Scheduling multi-operation jobs on a single machine
- Scheduling parallel machines for the customer order problem
- Single machine hierarchical scheduling with customer orders and multiple job classes
- Strong NP-hardness of the single machine multi-operation jobs total completion time scheduling problem.
- The customer order lead-time problem on parallel machines
- Worst Case Bound of an LRF Schedule for the Mean Weighted Flow-Time Problem
Cited in
(9)- Allowable processing orders in the accelerated cascade algorithm
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Metaheuristics for order scheduling problem with unequal ready times
- Minimizing total weighted completion time when scheduling orders in a flexible environment with uniform machines
- An order scheduling problem with position-based learning effect
- Solving customer order scheduling problems with an iterated greedy algorithm
- Minimizing the earliness-tardiness for the customer order scheduling problem in a dedicated machine environment
- Customer order scheduling on a serial-batch machine in precast bridge construction
- Scheduling orders for multiple product types to minimize total weighted completion time
This page was built for publication: Preemptive multiprocessor order scheduling to minimize total weighted flowtime
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2482817)