Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Optimizing schedules in the pipeline systems with variable job execution order

From MaRDI portal
Publication:2487556
Jump to:navigation, search

DOI10.1007/S10513-005-0070-9zbMATH Open1075.90030OpenAlexW2075951661MaRDI QIDQ2487556FDOQ2487556


Authors: V. I. Levin Edit this on Wikidata


Publication date: 8 August 2005

Published in: Automation and Remote Control (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10513-005-0070-9




Recommendations

  • Synthesis of optimal schedules in sequential systems with variable procedures. II
  • scientific article; zbMATH DE number 2106848
  • Optimal assignment of ordered jobs
  • Scheduling optimization in systems with indefinite times of processing. II
  • An \(M\)-stage system with indeterminate processing time. I: Schedule optimization


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Cites Work

  • Title not available (Why is that?)
  • Optimal two- and three-stage production schedules with set-up time included


Cited In (1)

  • Title not available (Why is that?)





This page was built for publication: Optimizing schedules in the pipeline systems with variable job execution order

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2487556)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2487556&oldid=15190507"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 3 February 2024, at 01:48. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki