Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
From MaRDI portal
Publication:2489296
DOI10.1016/J.COR.2005.02.019zbMATH Open1086.90004OpenAlexW1968641196MaRDI QIDQ2489296FDOQ2489296
Authors: Ahmad Diponegoro, Bhaba R. Sarker
Publication date: 16 May 2006
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2005.02.019
Recommendations
- Finite horizon planning with fixed-interval deliveries and no shortage
- Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system
- Backtracking and its Amoebic Properties in One-dimensional Machine Location Problems
- Operations policy for a supply chain system with fixed-interval delivery and linear demand
- An optimal batch size under a periodic delivery policy
Cites Work
- A one-vendor multi-buyer integrated inventory model
- Economic analysis of inventory systems
- Two-Interval Inventory-Allocation Policies in a One-Warehouse N-Identical-Retailer Distribution System
- Joint Vendor-buyer Policy in JIT Manufacturing
- A one-vendor multi-buyer integrated inventory model: A comment
- Simple Solution Procedures for a Class of Two-Echelon Inventory Problems
- Title not available (Why is that?)
- Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system
- Stochastic inventory problem with piecewise quadratic holding cost function containing a cost-free interval
Cited In (8)
- Finite horizon planning with fixed-interval deliveries and no shortage
- Fuzzy scheduling of a build-to-order supply chain
- Operations policy for a supply chain system with fixed-interval delivery and linear demand
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers
- An optimal batch size under a periodic delivery policy
- Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
- Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure
- Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
This page was built for publication: Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2489296)