A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert
From MaRDI portal
(Redirected from Publication:2490218)
Recommendations
- A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine
- Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
- A Branch-and-Bound Algorithm for Single-Machine Earliness–Tardiness Scheduling with Idle Time
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness
- A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem
Cites work
- scientific article; zbMATH DE number 3947944 (Why is no real title available?)
- A Heuristic Algorithm for Sequencing on One Machine to Minimize Total Tardiness
- A heuristic for the single machine tardiness problem
- A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem
- A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem
- A simulated annealing approach for the one-machine mean tardiness scheduling problem
- A tabu search approach for the single machine mean tardiness problem
- Algorithms for a class of single-machine weighted tardiness and earliness problems
- Common due date scheduling problem with separate earliness and tardiness penalties
- Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
- On the Single-machine Scheduling Problem with Tardiness Penalties
- One-Machine Sequencing to Minimize Certain Functions of Job Tardiness
- Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
- Optimal timing schedules in earliness-tardiness single machine sequencing
- The Single Machine Early/Tardy Problem
Cited in
(6)- A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
- Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness
This page was built for publication: A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2490218)