Cross-facility management of production and transportation planning problem
DOI10.1016/j.cor.2005.02.038zbMath1113.90052OpenAlexW1994404409MaRDI QIDQ2499157
H. Edwin Romeijn, Panos M. Pardalos, Sandra Duni Ekşioğlu
Publication date: 14 August 2006
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2005.02.038
heuristic approachsupply chainsproduction planning problemfixed-charge network flow problemtransportation planning problem
Transportation, logistics and supply chain management (90B06) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Deterministic network models in operations research (90B10)
Related Items (11)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A new dynamic programming algorithm for the single item capacitated dynamic lot size model
- Coordination of production and distribution planning
- Integrated production/distribution planning in supply chains: An invited review
- Dynamic Version of the Economic Lot Size Model
- A Branch-and-Price Algorithm for the Multiperiod Single-Sourcing Problem
- Analysis of a flow problem with fixed charges
- A Dual-Based Procedure for Uncapacitated Facility Location
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- The complexity of the network design problem
- Manufacturing Planning Over Alternative Facilities: Modeling, Analysis and Algorithms
- Minimum Concave Cost Flows in Certain Networks
- A probabilistic analysis of the multi-period single-sourcing problem
This page was built for publication: Cross-facility management of production and transportation planning problem