Network flow approaches to pre-emptive open-shop scheduling problems with time-windows
From MaRDI portal
Publication:2503223
DOI10.1016/j.ejor.2005.01.062zbMath1103.90048MaRDI QIDQ2503223
Publication date: 14 September 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.01.062
scheduling problem; time-windows; Max-flow parametrical algorithm; network flow approach; pre-emptive open-shop
90C35: Programming involving graphs or networks
90B35: Deterministic scheduling theory in operations research
90B10: Deterministic network models in operations research
Related Items
Solving the parametric bipartite maximum flow problem in unbalanced and closure bipartite graphs, Shortest path problems with left-side time windows, A solution approach to find the critical path in a time-constrained activity network, A network flow-based method to solve performance cost and makespan open-shop scheduling problems with time-windows, A survey on scheduling problems with due windows
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A parametric maximum flow algorithm for bipartite graphs with applications
- Scheduling jobs to minimize total cost
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops
- Open Shop Scheduling to Minimize Finish Time
- On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A Fast Parametric Maximum Flow Algorithm and Applications
- Fast Algorithms for Parametric Scheduling Come From Extensions to Parametric Maximum Flow
- Scheduling Jobs on Several Machines with the Job Splitting Property