Optimization analysis of the machine repair problem with multiple vacations and working breakdowns
From MaRDI portal
Publication:2514641
Recommendations
- Profit optimisation of the multiple-vacation machine repair problem using particle swarm optimisation
- Comparative analysis of the machine repair problem with imperfect coverage and service pressure condition
- Cost analysis and optimization of machine repair model with working vacation and feedback-policy
- Analysis and optimization of an \(M/G/1\) machine repair problem with multiple imperfect coverage
- Performance analysis and optimization of a machine repair problem with warm spares and two heterogeneous repairmen
Cites work
- \(N\)-policy for a machine repair system with spares and reneging
- \(N\)-policy queueing system with finite source and warm spares.
- A deteriorating system with its repairman having multiple vacations
- A MARKOV REPAIRABLE SYSTEM INVOLVING AN IMPERFECT SERVICE STATION WITH MULTIPLE VACATIONS
- A Markovian queue with two heterogeneous servers and multiple vacations
- A survey of the machine interference problem
- A vacation queueing model with service breakdowns
- An \(M/M/2\) queueing system with heterogeneous servers and multiple vacations
- Analysis of an M/M/1 queueing system with impatient customers and a variant of multiple vacation policy
- Comparative analysis of the machine repair problem with imperfect coverage and service pressure condition
- Computational intelligence. Concepts to implementations.
- Cost analysis of the M/M/R machine repair problem with balking, reneging, and server breakdowns
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- Non-linear system control using a recurrent fuzzy neural network based on improved particle swarm optimisation
- Note on ``Cost analysis of the M/M/R machine repair problem with second optional repair: Newton-quasi method
- Numerical investigation of finite-source multiserver systems with different vacation policies
- Optimal management of the machine repair problem with working vacation: Newton's method
- Particle Swarm Optimization
- Profit Analysis of the Machine-repair Problem with a Single Service Station Subject to Breakdowns
- Profit optimisation of the multiple-vacation machine repair problem using particle swarm optimisation
- Queueing systems with vacations - a survey
- Reliability analysis for a k-out-of-n:G system with redundant dependency and repairmen having multiple vacations
- Sensitivity analysis of machine repair problems in manufacturing systems with service interruptions
- Stochastic Decompositions in the M/G/1 Queue with Generalized Vacations
- The Finite Capacity GI/M/1 Queue with Server Vacations
- Vacation policies for machine repair problem with two type spares
- Vacation queueing models. Theory and applications
Cited in
(17)- Genetic algorithm to the machine repair problem with two removable servers operating under the triadic \((0, {Q}, {N}, {M})\) policy
- Cost analysis and optimization of machine repair model with working vacation and feedback-policy
- Admission control for finite capacity queueing model with general retrial times and state-dependent rates
- Optimal control of a service system with emergency vacation using bat algorithm
- Note on ``Cost analysis of the M/M/R machine repair problem with second optional repair: Newton-quasi method
- Vacation policies for machine repair problem with two type spares
- Analysis and optimization of an \(M/G/1\) machine repair problem with multiple imperfect coverage
- Computational analysis of machine repair problem with unreliable multi-repairmen
- A survey on queues in machining system: progress from 2010 to 2017
- Survey on queueing models with standbys support
- Performance analysis of machine repair system with single working vacation
- Profit optimisation of the multiple-vacation machine repair problem using particle swarm optimisation
- Profit Analysis of the Machine-repair Problem with a Single Service Station Subject to Breakdowns
- Performance analysis and cost investigations for state-dependent single unreliable server finite queue under \(F\)-policy using GA and QNM
- N-policy for redundant machining system with double retrial orbits using soft computing techniques
- Matrix-augmentation approach for machine repair problem with generally distributed repair times during working breakdown periods
- Optimal management of the machine repair problem with working vacation: Newton's method
This page was built for publication: Optimization analysis of the machine repair problem with multiple vacations and working breakdowns
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2514641)